Kitchen Fitting

The room your house is built around, fitted to the millimetre.

Sage green shaker kitchen with brass hardware and herringbone oak flooring

A kitchen succeeds or fails in the fitting. The same cabinetry, fitted poorly, reads as flat-pack; fitted well, it reads as built for the house — because it is. We scribe to walls that aren't square, align every gap line, and treat the finishing carpentry as part of the job, not an extra.

We fit kitchens from any supplier, or build cabinetry in our own workshop where off-the-shelf won't do. Either way, one team carries the project from survey to handover.

What's included

Everything the job needs. Nothing it doesn't.

01

Full project management

Plumbing, electrics, plastering and flooring coordinated around the fit, so you deal with one point of contact.

02

Worktop templating

Stone, solid timber or composite — templated on site after base units are set, never from drawings alone.

03

Appliance integration

Integrated appliances housed and vented properly, with service access kept for the day they need it.

04

Finishing carpentry

Pelmets, cornices, end panels and scribes — the details that make a kitchen look grown into the room.

The process

From first visit to final coat.

  1. Survey

    We measure the room itself — floors, walls and levels — not just the plan, and flag anything that will fight the design.

  2. Schedule

    A fitting programme that sequences trades correctly, with a realistic timeline you can hold us to.

  3. The fit

    Cabinetry set level and true, worktops templated and fitted, appliances commissioned, every line checked.

  4. Handover

    A finished kitchen, a clean site, and a snagging visit booked before we consider the job closed.

Bespoke kitchen island with solid oak worktop and Belfast sink

Before you ask

Questions, answered straight.

Anything else on your mind? Call us — you'll speak to a joiner, not a call centre.

Both. We fit kitchens supplied by you from any manufacturer, and we design and build bespoke cabinetry in our own workshop where a standard range won't achieve the design.

A typical full installation runs two to three weeks depending on the scope of plumbing, electrical and plastering work. We confirm a programme in writing before we start.

Yes — we coordinate trusted, certified plumbers and electricians we work with on every project, so the whole job runs to one schedule.